A greenfield site. A 20 MW concept. A disciplined path forward.
Nexus Power is developing a purpose-built 20 MW gross generation concept. Final capacity, technology and configuration remain subject to detailed studies, validation and formal approvals.
- 20 MW
- Gross base concept
- 30-yr
- Site-right basis
- 6
- Development workstreams
- Gated
- Execution model
A defined base supports disciplined execution.
- Location
- Dalanjargalan soum, Dornogovi Province
- Development type
- Greenfield power project
- Base concept
- 20 MW gross, not installed or approved capacity
- Site-right basis
- 30-year development basis
- Current status
- Development and validation; not construction-ready
Construction follows only after each gate is cleared.
- 01
Site
Confirm land, geotechnical conditions, access, logistics and enabling infrastructure.
- 02
Inputs
Confirm representative fuel, water availability and operating requirements.
- 03
Design
Compare generation, cooling, emissions, ash, electrical and control options.
- 04
Approvals
Secure grid, environmental, construction, operating and customer pathways.
The 20 MW concept rests on six independent workstreams.
Greenfield diligence
Verify land, geotechnical conditions, access and utility corridors.
Fuel validation
Confirm quality, variability, annual requirement and handling.
Water solution
Define source, use, treatment, cooling choice and discharge.
Technology selection
Compare lifecycle performance, emissions and operating fit.
Grid & customer pathway
Define connection, evacuation, metering, dispatch and offtake.
Environmental & permits
Complete assessments and obtain written approvals.
A clear base, advanced with discipline.
- 01
Purpose-built location
A controlled greenfield site lets layout and infrastructure be engineered around the selected technology.
- 02
Long-term site control
A 30-year site-right basis provides a structured platform for development.
- 03
Potential fuel advantage
A nearby sponsor-controlled resource may provide a logistics advantage, subject to validation.
- 04
Defined base concept
The 20 MW gross configuration is an evaluation basis, not installed or approved capacity.
- 05
Gated execution
Construction follows only after technical, environmental, regulatory and customer risks are resolved.
与集团联系。
有关任何 Nexus 公司的合作、供应、投资或媒体事宜,请联系乌兰巴托集团办公室。