01Coal · Mining
Gobi Nexus
Dalan Coal Project
A rail-linked hard-coal operation in Dornogovi with SGS-verified quality and a defined mining plan.
- 10.81 Mt
- Geological reserve
- 21 km
- To rail junction 25
Our portfolio combines the physical, digital, and protective capabilities required by modern industry.
Each business is led by its own team against a shared standard, assess, plan, deploy, control.
01Coal · Mining
Dalan Coal Project
A rail-linked hard-coal operation in Dornogovi with SGS-verified quality and a defined mining plan.
02Coal · Humic
Shanagan Project
Two resources in one licensed area, a coal reserve alongside a large humic resource for agriculture.
03Energy
Greenfield power project
A purpose-built generation project advancing through gated site, fuel, water and grid validation.
04Digital Infrastructure
AI & HPC campus
A greenfield, liquid-cooling-ready data campus structured for high-density AI and HPC workloads.
05Transport
Road & rail freight
Two-way commodity freight from mine to border and back, pairing an electric fleet with rail partners.
06Protection
Contract security
Site-specific protection through trained personnel, active supervision and technology-enabled monitoring.
For partnership, supply, investment or media enquiries across any Nexus company, reach the group office in Ulaanbaatar.