A greenfield site. A 20 MW concept. A disciplined path forward.

Nexus Power is developing a purpose-built 20 MW gross generation concept. Final capacity, technology and configuration remain subject to detailed studies, validation and formal approvals.

20 MW
Gross base concept
30-yr
Site-right basis
6
Development workstreams
Gated
Execution model

A defined base supports disciplined execution.

Location
Dalanjargalan soum, Dornogovi Province
Development type
Greenfield power project
Base concept
20 MW gross, not installed or approved capacity
Site-right basis
30-year development basis
Current status
Development and validation; not construction-ready

Construction follows only after each gate is cleared.

  1. 01

    Site

    Confirm land, geotechnical conditions, access, logistics and enabling infrastructure.

  2. 02

    Inputs

    Confirm representative fuel, water availability and operating requirements.

  3. 03

    Design

    Compare generation, cooling, emissions, ash, electrical and control options.

  4. 04

    Approvals

    Secure grid, environmental, construction, operating and customer pathways.

The 20 MW concept rests on six independent workstreams.

  • Greenfield diligence

    Verify land, geotechnical conditions, access and utility corridors.

  • Fuel validation

    Confirm quality, variability, annual requirement and handling.

  • Water solution

    Define source, use, treatment, cooling choice and discharge.

  • Technology selection

    Compare lifecycle performance, emissions and operating fit.

  • Grid & customer pathway

    Define connection, evacuation, metering, dispatch and offtake.

  • Environmental & permits

    Complete assessments and obtain written approvals.

A clear base, advanced with discipline.

  1. 01

    Purpose-built location

    A controlled greenfield site lets layout and infrastructure be engineered around the selected technology.

  2. 02

    Long-term site control

    A 30-year site-right basis provides a structured platform for development.

  3. 03

    Potential fuel advantage

    A nearby sponsor-controlled resource may provide a logistics advantage, subject to validation.

  4. 04

    Defined base concept

    The 20 MW gross configuration is an evaluation basis, not installed or approved capacity.

  5. 05

    Gated execution

    Construction follows only after technical, environmental, regulatory and customer risks are resolved.